国产精品一区二区三区Av_久久激情五月网站_a免费高清无码中文_九九99久久精品国产

Industry News
Location: Home>> News>>Industry News

Paper cup machine operating procedures - start production when the work

2022-07-18 14:49:33
0

Paper Cup Machine Operating Procedures - Work When Starting Production

1. After the preparatory work is completed, when starting the motor, shout to start without any response. (This is to prevent the operator from being invisible when repairing on the opposite side or behind the machine, causing unnecessary safety accidents).

2. Carefully observe the operation of the machine, take a cup to check the bonding effect of the paper cup, preheat, main heat, whether the knurling is yellow, and the paper cup is damaged.

3. Check the bonding effect of the bonding place, whether there is any indirect defect, the bonding firmness between the bottom of the cup and the bonding is tearing and pulling, and the indirect non-swabbing is a suspected leaking cup, which is subject to the water test.

paper cup machine

4. During normal operation, if you find or feel that the machine is abnormal, you should lift the cup body first, and stop the inspection after the last cup is knurled.

5. If the machine is stopped unexpectedly in the middle, when the machine is restarted for a long time, take out the fourth .5 piece in the market and check whether the knurled part is bonded.

6. Paper Cup MachineThe operator should pay attention to the cup mouth, The shape of the cup body and the bottom of the cup, and the adhesion and size appearance of the cup body are checked from time to time.

7. If employees concentrate their energy during the operation and find abnormal sound or the bottom of the cup is poorly formed, they should stop the machine immediately to check to avoid greater losses.

8. Operators should be conscientious and responsible in the production process, and test the cups produced by themselves with boiling water every hour, 8 cups each time.

9. Paper cup machineThe operator should Quantity is sampled for inspection. After the sampling inspection is correct, cut out the product certificate or product pattern, paste it on the upper right corner of the left side of the carton, fill in the work number and production date in the box, and finally stack the sealed boxes neatly in the designated position.

Tags

Dongguan Hongxin Machinery Manufacturing Co., Ltd.

Phone:13590316866 

Email:fullsailchina@163.com

Address:No. 9 Taicheng Road, Shajiao Community, Humen Town, Dongguan City, Guangdong Province

WeChat